Name 20L Paint Barrel Lid molding
mould steel 45#,P20,2738,2344,2316,718,S136,H13 et
mould base LKM,HASCO,DME or according to custom's request
Mould Cavity No. single or Multiple cavity
Runner system cold runner/hot runner
surface treatment polishing,texture or as per customer request
design software CAD, PRO-E, UG etc.
design time within 3days
Plastic material
ABS,PP,PC ,PA6,PA66, TPU,POM ,PBT,PVC,HIPS,PMMA,
TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE.
mould production time 15--60days, on basis of the difficulty level
mould life
500-1000 thousand times
Bucket Cooling System
Cooling system has 2 functions:
1.Improve the productivity
2.To make sure a mould could be effectived use
Mould cooling system will spent 2/3 time of a mould, so we choose the recycle water of the bucket mould,it help us reduce the cost and improve our economy effective.
Engineering Control:
1: Feasibility study is necessary before mold design.
2. There is a pre-design meeting among manufacture team, project team and engineering team, synthesize all the suggestions and work out the best solution for the project.
3. All the design must be approved by business manager and project manager, who have profound experience in mould making and injection molding industry.
4. The design will be presented and fully communicated with customer to secure customer's final approval.
5. There is different technical handbook for each customer, all the designed concept must fully according to customer standard.
Step
1.R&D
We support customers R&D. Make the files or improve the design if needed.
↓
2.Negotiation
Quality,price,material,delivery time,payment item,etc.
↓
3.Place an order
According to customers Requirements & Design or choose ours
↓
4.Mould
Send mould design for customers approval→make the mould
↓
5.sample shoot
We will send trial sample to customers before shipment. If it’s not satisfying, we will modify mould until meet customers' satisfaction.
↓
6.Products in store
If your quantity is beyond our storage, we will provide lead time for you.
↓
7.Transportation
Delivery goods by sea or by air or according to customers preference.
20L Paint Barrel Lid molding Packing
Hongmei Service
1.Lead time: 30-60 working days
2.Design period: 1-5 working days
3.Email reply: within 24 hours
4.Quotation: within 2 working days
5.Customer complaints: reply within 12 hours
6.Phone call service: 24H/7D/365D
7.Spare parts: 30%, 50%, 100%, according to specific requirement
8.Free sample: according to specific requirement